2/8-N-11 A
Development, productionProducing
Drilled by Aker BP ASA with Noble Invincible in Valhall, 28.09.2023 to 15.11.2023 (48 days), to 5 124,0 m.
Water depth69,8 m
Total depth5 124,0 m MD
Vertical depth2 613,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table66,8 m
Formation at total depth-
RigNoble Invincible
Spud28.09.2023
Completed15.11.2023
OperatorAker BP ASA
Position56,3243 N, 3,3527 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 76 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.