2/8-N-12
Development, observationPlugged
Drilled by BP Norge AS with West Epsilon in Valhall, 29.12.2003 to 15.01.2004 (17 days), to 3 078,0 m.
Water depth69,8 m
Total depth3 078,0 m MD
Vertical depth2 859,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,7 m
Formation at total depth-
RigWest Epsilon
Spud29.12.2003
Completed15.01.2004
OperatorBP Norge AS
Position56,3244 N, 3,3527 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 83 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-N-12 A same well | 0,0 | 5 658,0 | - | - | 2004 |
| 2/8-N-8 | 0,0 | 6 420,0 | - | - | 2018 |
| 2/8-N-11 | 0,0 | 4 683,0 | - | - | 2004 |
| 2/8-N-11 A | 0,0 | 5 124,0 | - | - | 2023 |
| 2/8-N-16 | 0,0 | 4 821,0 | - | - | 2012 |
| 2/8-N-7 | 0,0 | 4 235,0 | - | - | 2004 |
| 2/8-N-15 | 0,0 | 5 550,0 | - | - | 2003 |
| 2/8-N-10 | 0,0 | 4 656,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.