WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-N-8

2/8-N-8

Development, productionProducingOil

Drilled by Aker BP ASA with Maersk Invincible in Valhall, 24.11.2018 to 04.01.2019 (41 days), to 6 420,0 m.

Water depth69,8 m
Total depth6 420,0 m MD
Vertical depth2 557,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,7 m
Formation at total depth-
RigMaersk Invincible
Spud24.11.2018
Completed04.01.2019
OperatorAker BP ASA
Position56,3244 N, 3,3527 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient75 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-N-120,03 078,0--2003
2/8-N-12 A0,05 658,0--2004
2/8-N-70,04 235,0--2004
2/8-N-40,05 123,0--2018
2/8-N-110,04 683,0--2004
2/8-N-11 A0,05 124,0--2023
2/8-N-30,0572,0--2006
2/8-N-3 AY10,04 578,0--2006

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗