2/8-N-4
Development, injectionInjectingWater
Drilled by Aker BP ASA with Maersk Invincible in Valhall, 16.10.2018 to 12.11.2018 (27 days), to 5 123,0 m.
Water depth69,8 m
Total depth5 123,0 m MD
Vertical depth2 569,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table67,6 m
Formation at total depth-
RigMaersk Invincible
Spud16.10.2018
Completed12.11.2018
OperatorAker BP ASA
Position56,3244 N, 3,3527 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 75 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-N-3 | 0,0 | 572,0 | - | - | 2006 |
| 2/8-N-3 AY1 | 0,0 | 4 578,0 | - | - | 2006 |
| 2/8-N-3 AY2 | 0,0 | - | - | - | - |
| 2/8-N-3 B | 0,0 | 5 050,0 | - | - | 2021 |
| 2/8-N-8 | 0,0 | 6 420,0 | - | - | 2018 |
| 2/8-N-7 | 0,0 | 4 235,0 | - | - | 2004 |
| 2/8-N-12 | 0,0 | 3 078,0 | - | - | 2003 |
| 2/8-N-12 A | 0,0 | 5 658,0 | - | - | 2004 |
Casing and formation tests
No casing programme is reported for this wellbore.