Fields / Valhall / 2/8-N-3 AY2
2/8-N-3 AY2
Development, productionWill never be drilled
A planned wellbore in Valhall that the register says will never be drilled.
Water depth69,8 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table59,7 m
Formation at total depth-
RigWest Epsilon
Spud-
Completed-
OperatorBP Norge AS
Position56,3244 N, 3,3527 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.