Fields / Valhall / 2/8-N-3 AY1
2/8-N-3 AY1
Development, productionPluggedOil
Drilled by BP Norge AS with West Epsilon in Valhall, 25.05.2006 to 07.09.2006 (105 days), to 4 578,0 m.
Water depth69,8 m
Total depth4 578,0 m MD
Vertical depth2 779,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,7 m
Formation at total depth-
RigWest Epsilon
Spud25.05.2006
Completed07.09.2006
OperatorBP Norge AS
Position56,3244 N, 3,3527 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 81 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.