2/8-N-2
Development, observationPlugged
Drilled by BP Norge AS with West Epsilon in Valhall, 09.08.2003 to 14.08.2003 (5 days), to 584,0 m.
Water depth69,8 m
Total depth584,0 m MD
Vertical depth584,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table59,9 m
Formation at total depth-
RigWest Epsilon
Spud09.08.2003
Completed14.08.2003
OperatorBP Norge AS
Position56,3244 N, 3,3526 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 17 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-N-2 A same well | 0,0 | 4 450,0 | - | - | 2021 |
| 2/8-N-1 | 0,0 | 578,0 | - | - | 2012 |
| 2/8-N-1 A | 0,0 | 3 340,0 | - | - | 2012 |
| 2/8-N-1 B | 0,0 | 4 854,0 | - | - | 2012 |
| 2/8-N-1 C | 0,0 | 6 808,0 | - | - | 2021 |
| 2/8-N-3 | 0,0 | 572,0 | - | - | 2006 |
| 2/8-N-3 AY1 | 0,0 | 4 578,0 | - | - | 2006 |
| 2/8-N-3 AY2 | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.