2/7-A-23 B
Development, productionClosedOil and gas
Drilled by Phillips Petroleum Company Norway with Eldfisk A in Eldfisk, 10.12.1990 to 22.02.1991 (74 days), to 3 406,0 m.
Water depth71,0 m
Total depth3 406,0 m MD
Vertical depth3 117,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table41,0 m
Formation at total depth-
RigEldfisk A
Spud10.12.1990
Completed22.02.1991
OperatorPhillips Petroleum Company Norway
Position56,3767 N, 3,2657 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 106 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-A-23 same well | 0,0 | 3 604,9 | - | - | 1979 |
| 2/7-A-23 A same well | 0,0 | - | - | - | - |
| 2/7-A-20 | 0,0 | 3 255,6 | - | - | 1978 |
| 2/7-A-20 A | 0,0 | 3 140,0 | - | - | 1984 |
| 2/7-A-20 B | 0,0 | 3 734,0 | - | - | 2006 |
| 2/7-A-26 | 0,0 | 3 737,5 | - | - | 1978 |
| 2/7-A-24 | 0,0 | 4 095,6 | - | - | 1979 |
| 2/7-A-24 A | 0,0 | 3 719,0 | - | - | 2002 |
Casing and formation tests
No casing programme is reported for this wellbore.