WellplannerNorwegian shelf well data

Fields / Eldfisk / 2/7-A-26

2/7-A-26

Development, productionClosedOil

Drilled by Phillips Petroleum Company Norway with Eldfisk A in Eldfisk, 08.10.1978 to 20.12.1978 (73 days), to 3 737,5 m.

Water depth71,0 m
Total depth3 737,5 m MD
Vertical depth3 083,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table41,0 m
Formation at total depth-
RigEldfisk A
Spud08.10.1978
Completed20.12.1978
OperatorPhillips Petroleum Company Norway
Position56,3767 N, 3,2657 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Eldfisk gradient34,0 °C/km
Estimated at total depth from the gradient105 °C

The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/7-A-290,04 052,0--1981
2/7-A-29 A0,03 971,0--1986
2/7-A-29 B0,03 475,0--2004
2/7-A-230,03 604,9--1979
2/7-A-23 A0,0----
2/7-A-23 B0,03 406,0--1990
2/7-A-250,03 246,4--1978
2/7-A-270,03 513,7--1980

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗