2/7-A-25
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Eldfisk A in Eldfisk, 05.06.1978 to 08.01.1979 (217 days), to 3 246,4 m.
Water depth71,0 m
Total depth3 246,4 m MD
Vertical depth3 096,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table41,0 m
Formation at total depth-
RigEldfisk A
Spud05.06.1978
Completed08.01.1979
OperatorPhillips Petroleum Company Norway
Position56,3767 N, 3,2658 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 105 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-A-22 | 0,0 | 1 534,0 | - | - | 1978 |
| 2/7-A-22 A | 0,0 | 4 936,0 | - | - | 2000 |
| 2/7-A-22 B | 0,0 | 4 289,0 | - | - | 2008 |
| 2/7-A-26 | 0,0 | 3 737,5 | - | - | 1978 |
| 2/7-A-19 | 0,0 | 3 310,1 | - | - | 1978 |
| 2/7-A-19 A | 0,0 | 3 215,6 | - | - | 1990 |
| 2/7-A-19 B | 0,0 | 4 463,0 | - | - | 2000 |
| 2/7-A-23 | 0,0 | 3 604,9 | - | - | 1979 |
Casing and formation tests
No casing programme is reported for this wellbore.