2/7-A-29
Development, productionPluggedOil
Drilled by Phillips Petroleum Company Norway with Eldfisk A in Eldfisk, 01.10.1981 to 24.12.1981 (84 days), to 4 052,0 m.
Water depth71,0 m
Total depth4 052,0 m MD
Vertical depth2 940,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table41,0 m
Formation at total depth-
RigEldfisk A
Spud01.10.1981
Completed24.12.1981
OperatorPhillips Petroleum Company Norway
Position56,3768 N, 3,2657 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 100 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-A-29 A same well | 0,0 | 3 971,0 | - | - | 1986 |
| 2/7-A-29 B same well | 0,0 | 3 475,0 | - | - | 2004 |
| 2/7-A-26 | 0,0 | 3 737,5 | - | - | 1978 |
| 2/7-A-28 | 0,0 | 4 609,8 | - | - | 1978 |
| 2/7-A-28 A | 0,0 | 5 011,0 | - | - | 2000 |
| 2/7-A-30 | 0,0 | 3 723,4 | - | - | 1980 |
| 2/7-A-30 A | 0,0 | 3 654,0 | - | - | 1983 |
| 2/7-A-30 B | 0,0 | 4 998,0 | - | - | 2006 |
Casing and formation tests
No casing programme is reported for this wellbore.