2/7-A-28 A
Development, productionClosedOil
Drilled by Phillips Petroleum Company Norway with Eldfisk A in Eldfisk, 01.11.2000 to 16.01.2001 (76 days), to 5 011,0 m.
Water depth70,0 m
Total depth5 011,0 m MD
Vertical depth2 982,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table43,0 m
Formation at total depth-
RigEldfisk A
Spud01.11.2000
Completed16.01.2001
OperatorPhillips Petroleum Company Norway
Position56,3768 N, 3,2658 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-A-28 same well | 0,0 | 4 609,8 | - | - | 1978 |
| 2/7-A-29 | 0,0 | 4 052,0 | - | - | 1981 |
| 2/7-A-29 A | 0,0 | 3 971,0 | - | - | 1986 |
| 2/7-A-29 B | 0,0 | 3 475,0 | - | - | 2004 |
| 2/7-A-25 | 0,0 | 3 246,4 | - | - | 1978 |
| 2/7-A-26 | 0,0 | 3 737,5 | - | - | 1978 |
| 2/7-A-22 | 0,0 | 1 534,0 | - | - | 1978 |
| 2/7-A-22 A | 0,0 | 4 936,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.