2/7-A-24 B
Development, productionProducingOil and gas
Drilled by ConocoPhillips Skandinavia AS with Eldfisk A in Eldfisk, 18.06.2022 to 18.07.2022 (30 days), to 4 435,0 m.
Water depth70,0 m
Total depth4 435,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table72,4 m
Formation at total depth-
RigEldfisk A
Spud18.06.2022
Completed18.07.2022
OperatorConocoPhillips Skandinavia AS
Position56,3767 N, 3,2657 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 150 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-A-24 same well | 0,0 | 4 095,6 | - | - | 1979 |
| 2/7-A-24 A same well | 0,0 | 3 719,0 | - | - | 2002 |
| 2/7-A-27 | 0,0 | 3 513,7 | - | - | 1980 |
| 2/7-A-27 A | 0,0 | 4 779,0 | - | - | 2011 |
| 2/7-A-23 | 0,0 | 3 604,9 | - | - | 1979 |
| 2/7-A-23 A | 0,0 | - | - | - | - |
| 2/7-A-23 B | 0,0 | 3 406,0 | - | - | 1990 |
| 2/7-A-21 | 0,0 | 3 515,3 | - | - | 1979 |
Casing and formation tests
No casing programme is reported for this wellbore.