WellplannerNorwegian shelf well data

Fields / Eldfisk / 2/7-S-1

2/7-S-1

Development, productionProducingOil

Drilled by ConocoPhillips Skandinavia AS with Mærsk Innovator in Eldfisk, 16.01.2018 to 15.02.2018 (30 days), to 5 808,0 m.

Water depth73,0 m
Total depth5 808,0 m MD
Vertical depth3 043,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,6 m
Formation at total depth-
RigMærsk Innovator
Spud16.01.2018
Completed15.02.2018
OperatorConocoPhillips Skandinavia AS
Position56,3736 N, 3,2630 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Eldfisk gradient34,0 °C/km
Estimated at total depth from the gradient102 °C

The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/7-S-60,05 103,0--2015
2/7-S-6 A0,05 865,0--2017
2/7-S-20,05 144,0--2017
2/7-S-70,03 651,0--2013
2/7-S-30,04 054,0--2017
2/7-S-110,05 667,0--2020
2/7-S-120,05 765,0--2018
2/7-S-80,04 347,0--2013

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗