2/7-S-6
Development, productionJunked
Drilled by ConocoPhillips Skandinavia AS with Mærsk Innovator in Eldfisk, 20.06.2015 to 23.09.2015 (95 days), to 5 103,0 m.
Water depth73,0 m
Total depth5 103,0 m MD
Vertical depth2 910,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,0 m
Formation at total depth-
RigMærsk Innovator
Spud20.06.2015
Completed23.09.2015
OperatorConocoPhillips Skandinavia AS
Position56,3736 N, 3,2630 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 99 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.