2/7-S-17
Development, injectionInjectingWater
Drilled by ConocoPhillips Skandinavia AS with Mærsk Innovator in Eldfisk, 05.01.2016 to 03.02.2016 (29 days), to 5 011,0 m.
Water depth73,0 m
Total depth5 011,0 m MD
Vertical depth2 990,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,0 m
Formation at total depth-
RigMærsk Innovator
Spud05.01.2016
Completed03.02.2016
OperatorConocoPhillips Skandinavia AS
Position56,3736 N, 3,2630 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-S-18 | 0,0 | 5 838,0 | - | - | 2016 |
| 2/7-S-16 | 0,0 | 6 542,0 | - | - | 2019 |
| 2/7-S-16 Y2 | 0,0 | 6 022,0 | - | - | 2019 |
| 2/7-S-16 Y3 | 0,0 | - | - | - | - |
| 2/7-S-16 Y4 | 0,0 | - | - | - | - |
| 2/7-S-22 | 0,0 | 4 846,0 | - | - | 2020 |
| 2/7-S-12 | 0,0 | 5 765,0 | - | - | 2018 |
| 2/7-S-23 Y1 | 0,0 | 6 255,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.