2/7-S-18
Development, injectionInjectingWater
Drilled by ConocoPhillips Skandinavia AS with Mærsk Innovator in Eldfisk, 22.11.2016 to 25.12.2016 (33 days), to 5 838,0 m.
Water depth73,0 m
Total depth5 838,0 m MD
Vertical depth2 936,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,0 m
Formation at total depth-
RigMærsk Innovator
Spud22.11.2016
Completed25.12.2016
OperatorConocoPhillips Skandinavia AS
Position56,3736 N, 3,2630 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 99 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-S-17 | 0,0 | 5 011,0 | - | - | 2016 |
| 2/7-S-13 | 0,0 | 4 201,0 | - | - | 2013 |
| 2/7-S-23 Y1 | 0,0 | 6 255,0 | - | - | 2019 |
| 2/7-S-23 Y2 | 0,0 | 6 212,0 | - | - | 2020 |
| 2/7-S-19 | 0,0 | 4 837,0 | - | - | 2020 |
| 2/7-S-14 | 0,0 | 3 504,0 | - | - | 2014 |
| 2/7-S-14 A | 0,0 | 5 351,0 | - | - | 2025 |
| 2/7-S-24 | 0,0 | 5 396,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.