WellplannerNorwegian shelf well data

Fields / Eldfisk / 2/7-S-24

2/7-S-24

Development, productionProducingOil and gas

Drilled by ConocoPhillips Skandinavia AS with West Elara in Eldfisk, 13.04.2020 to 05.06.2020 (53 days), to 5 396,0 m.

Water depth72,4 m
Total depth5 396,0 m MD
Vertical depth2 966,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table81,3 m
Formation at total depth-
RigWest Elara
Spud13.04.2020
Completed05.06.2020
OperatorConocoPhillips Skandinavia AS
Position56,3735 N, 3,2630 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Eldfisk gradient34,0 °C/km
Estimated at total depth from the gradient99 °C

The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/7-S-250,04 886,0--2019
2/7-S-290,06 179,0--2020
2/7-S-23 Y10,06 255,0--2019
2/7-S-23 Y20,06 212,0--2020
2/7-S-190,04 837,0--2020
2/7-S-300,04 989,0--2020
2/7-S-30 A0,04 531,9--2025
2/7-S-30 B0,0----

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗