2/7-S-29
Development, productionProducingOil
Drilled by ConocoPhillips Skandinavia AS with West Elara in Eldfisk, 21.10.2020 to 08.12.2020 (48 days), to 6 179,0 m.
Water depth73,0 m
Total depth6 179,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table81,3 m
Formation at total depth-
RigWest Elara
Spud21.10.2020
Completed08.12.2020
OperatorConocoPhillips Skandinavia AS
Position56,3735 N, 3,2630 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 209 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-S-30 | 0,0 | 4 989,0 | - | - | 2020 |
| 2/7-S-30 A | 0,0 | 4 531,9 | - | - | 2025 |
| 2/7-S-30 B | 0,0 | - | - | - | - |
| 2/7-S-24 | 0,0 | 5 396,0 | - | - | 2020 |
| 2/7-S-34 | 0,0 | 4 511,0 | - | - | 2015 |
| 2/7-S-34 A | 0,0 | 5 585,1 | - | - | 2024 |
| 2/7-S-28 | 0,0 | 5 449,0 | - | - | 2021 |
| 2/7-S-28 Y2 | 0,0 | 6 393,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.