2/7-S-30 A
Development, productionPlugged
Drilled by ConocoPhillips Skandinavia AS with Linus in Eldfisk, 11.04.2025 to 26.04.2025 (15 days), to 4 531,9 m.
Water depth72,1 m
Total depth4 531,9 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table78,8 m
Formation at total depth-
RigLinus
Spud11.04.2025
Completed26.04.2025
OperatorConocoPhillips Skandinavia AS
Position56,3735 N, 3,2630 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 153 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-S-30 same well | 0,0 | 4 989,0 | - | - | 2020 |
| 2/7-S-30 B same well | 0,0 | - | - | - | - |
| 2/7-S-35 | 0,0 | 4 548,0 | - | - | 2019 |
| 2/7-S-35 A | 0,0 | - | - | - | - |
| 2/7-S-29 | 0,0 | 6 179,0 | - | - | 2020 |
| 2/7-S-25 | 0,0 | 4 886,0 | - | - | 2019 |
| 2/7-S-24 | 0,0 | 5 396,0 | - | - | 2020 |
| 2/7-S-34 | 0,0 | 4 511,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.