2/7-U-28
Other, soil drillingPlugged and abandoned
Drilled by ConocoPhillips Skandinavia AS with Bucentaur in Eldfisk, 09.06.2009 to 09.06.2009 (0 days), to 111,0 m.
Water depth73,0 m
Total depth111,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigBucentaur
Spud09.06.2009
Completed09.06.2009
OperatorConocoPhillips Skandinavia AS
Position56,3731 N, 3,2630 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 5 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-U-25 | 0,0 | 136,0 | - | - | 2009 |
| 2/7-S-40 | 0,0 | 4 444,0 | - | - | 2019 |
| 2/7-S-40 A | 0,0 | - | - | - | - |
| 2/7-S-40 Y2 | 0,0 | - | - | - | - |
| 2/7-S-40 Y3 | 0,0 | - | - | - | - |
| 2/7-S-35 | 0,0 | 4 548,0 | - | - | 2019 |
| 2/7-S-35 A | 0,0 | - | - | - | - |
| 2/7-S-39 | 0,0 | 4 240,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.