2/8-10
Exploration, appraisalPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Sedco 135 G in Valhall, 30.06.1976 to 29.08.1976 (60 days), to 2 683,0 m in the Rødby Formation.
Formations
13 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 69 °C |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 79 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 174,0 | 36" | 174,0 | - |
| Surface casing | 20" | 368,0 | 26" | 375,0 | - |
| Intermediate | 13 3/8" | 1 280,0 | 17 1/2" | 1 286,0 | - |
| Intermediate | 9 5/8" | 2 602,0 | 12 1/4" | 2 682,0 | - |
Mud weight
5 measurements, one dot each, 1,00 to 1,89 g/cm³ against measured depth, spud-mud, water-based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 3 | 2 480,0 - 2 486,0 | 15,9 | - | - | 1 017 | 165 937 |
| 2 | 2 493,0 - 2 509,0 | 9,5 | - | - | 552 | 78 155 |
| 1 | 2 536,0 - 2 547,0 | 3,2 | - | - | 49 | 6 760 |