WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-9

2/8-9

Exploration, appraisalPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Sedco 135 G in Valhall, 09.04.1976 to 27.06.1976 (79 days), to 2 703,0 m in the Rødby Formation.

Water depth69,0 m
Total depth2 703,0 m MD
Vertical depth-
Bottom-hole temperature86 °C
Max inclination-
Rotary table33,0 m
Formation at total depthRødby Formation
RigSedco 135 G
Spud09.04.1976
Completed27.06.1976
OperatorAmoco Norway Oil Company
Position56,2970 N, 3,3844 E

Formations

12 tops reported, measured depth in metres.

GroupsNordland Group, top 102,0 mNordland GpRogaland Group, top 2 493,0 mShetland Group, top 2 524,0 mShetland GpCromer Knoll Group, top 2 658,0 mFormationsBalder Formation, top 2 493,0 mSele Formation, top 2 497,0 mLista Formation, top 2 505,0 mTor Formation, top 2 524,0 mHod Formation, top 2 529,0 mHod FmBlodøks Formation, top 2 637,0 mHidra Formation, top 2 640,0 mRødby Formation, top 2 658,0 m1025001 0001 5002 0002 5002 703

Temperature

Reported at total depth86 °C
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient80 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-111,82 655,074 °C1,891976
2/8-82,22 667,077 °C1,851975
2/8-A-122,23 893,0--1984
2/8-A-12 A2,23 373,0--1984
2/8-A-12 B2,23 657,0--1990
2/8-A-12 C2,23 209,0--2003
2/8-A-82,22 744,0--1983
2/8-A-8 A2,22 653,0--1995

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"183,036"183,0-
Surface casing20"435,026"442,0-
Intermediate13 3/8"1 285,017 1/2"1 290,0-
Intermediate9 5/8"2 510,012 1/2"2 518,0-
Liner7"2 701,08 1/2"2 704,0-

Mud weight

6 measurements, one dot each, 1,00 to 1,89 g/cm³ against measured depth, waterbased.

1,01,21,41,61,805001 0001 5002 0002 500261,0 m: 1,09 g/cm³, waterbased441,0 m: 1,05 g/cm³, waterbased1 157,0 m: 1,28 g/cm³, waterbased1 289,0 m: 1,29 g/cm³, waterbased2 324,0 m: 1,80 g/cm³, waterbased2 703,0 m: 1,89 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
22 525,0 - 2 529,0---35381 693
12 552,0 - 2 558,0-----
Show on the mapOpen on FactPages ↗