2/8-A-10 A
Development, productionPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Valhall in Valhall, 15.02.1988 to 06.03.1988 (20 days), to 3 518,5 m.
Water depth69,0 m
Total depth3 518,5 m MD
Vertical depth2 755,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud15.02.1988
Completed06.03.1988
OperatorAmoco Norway Oil Company
Position56,2780 N, 3,3954 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 81 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-A-10 same well | 0,0 | 3 991,0 | - | - | 1984 |
| 2/8-A-10 B same well | 0,0 | 4 588,0 | - | - | 1993 |
| 2/8-A-29 | 0,0 | 4 016,0 | - | - | 1990 |
| 2/8-A-14 | 0,0 | 3 393,5 | - | - | 1984 |
| 2/8-A-14 A | 0,0 | 3 363,0 | - | - | 1989 |
| 2/8-A-14 B | 0,0 | 4 020,0 | - | - | 1992 |
| 2/8-A-9 | 0,0 | 3 295,0 | - | - | 1983 |
| 2/8-A-9 A | 0,0 | 3 212,0 | - | - | 1997 |
Casing and formation tests
No casing programme is reported for this wellbore.