WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-A-10 B

2/8-A-10 B

Development, productionPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Valhall in Valhall, 22.09.1993 to 19.12.1993 (88 days), to 4 588,0 m.

Water depth69,0 m
Total depth4 588,0 m MD
Vertical depth2 635,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud22.09.1993
Completed19.12.1993
OperatorAmoco Norway Oil Company
Position56,2780 N, 3,3954 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient77 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-A-10 same well0,03 991,0--1984
2/8-A-10 A same well0,03 518,5--1988
2/8-A-290,04 016,0--1990
2/8-A-140,03 393,5--1984
2/8-A-14 A0,03 363,0--1989
2/8-A-14 B0,04 020,0--1992
2/8-A-90,03 295,0--1983
2/8-A-9 A0,03 212,0--1997

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗