2/8-A-13 C
Development, injectionPlugged and abandonedCuttings
Drilled by BP Norge AS with Valhall Dp in Valhall, 15.08.2003 to 23.09.2003 (39 days), to 4 198,0 m.
Water depth69,0 m
Total depth4 198,0 m MD
Vertical depth2 149,4 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table43,5 m
Formation at total depth-
RigValhall Dp
Spud15.08.2003
Completed23.09.2003
OperatorBP Norge AS
Position56,2782 N, 3,3953 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 63 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-A-13 same well | 0,0 | 3 507,0 | - | - | 1984 |
| 2/8-A-13 A same well | 0,0 | 3 471,0 | - | - | 1987 |
| 2/8-A-13 B same well | 0,0 | 3 142,0 | - | - | 1987 |
| 2/8-A-11 | 0,0 | 3 926,0 | - | - | 1984 |
| 2/8-A-11 A | 0,0 | 3 689,0 | - | - | 1986 |
| 2/8-A-11 B | 0,0 | 4 319,0 | - | - | 2002 |
| 2/8-A-17 | 0,0 | 4 065,0 | - | - | 1985 |
| 2/8-A-4 | 0,0 | 2 815,0 | - | - | 1982 |
Casing and formation tests
No casing programme is reported for this wellbore.