2/8-A-16 A
Development, productionPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Valhall in Valhall, 29.04.1986 to 02.06.1986 (34 days), to 3 020,0 m.
Water depth69,0 m
Total depth3 020,0 m MD
Vertical depth2 644,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud29.04.1986
Completed02.06.1986
OperatorAmoco Norway Oil Company
Position56,2781 N, 3,3955 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 78 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-A-16 same well | 0,0 | 3 643,0 | - | - | 1985 |
| 2/8-A-16 B same well | 0,0 | 2 999,0 | - | - | 1990 |
| 2/8-A-16 C same well | 0,0 | 3 515,0 | - | - | 1991 |
| 2/8-A-16 D same well | 0,0 | 4 057,0 | - | - | 1994 |
| 2/8-A-16 E same well | 0,0 | 4 465,0 | - | - | 2001 |
| 2/8-A-25 | 0,0 | 5 793,0 | - | - | 1990 |
| 2/8-A-25 A | 0,0 | 5 213,0 | - | - | 1995 |
| 2/8-A-25 B | 0,0 | 5 784,0 | - | - | 1995 |
Casing and formation tests
No casing programme is reported for this wellbore.