WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-A-16

2/8-A-16

Development, productionPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Valhall in Valhall, 07.02.1985 to 08.03.1985 (29 days), to 3 643,0 m.

Water depth69,0 m
Total depth3 643,0 m MD
Vertical depth2 738,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud07.02.1985
Completed08.03.1985
OperatorAmoco Norway Oil Company
Position56,2781 N, 3,3955 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient80 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-A-16 A same well0,03 020,0--1986
2/8-A-16 B same well0,02 999,0--1990
2/8-A-16 C same well0,03 515,0--1991
2/8-A-16 D same well0,04 057,0--1994
2/8-A-16 E same well0,04 465,0--2001
2/8-A-250,05 793,0--1990
2/8-A-25 A0,05 213,0--1995
2/8-A-25 B0,05 784,0--1995

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗