2/8-A-19 A
Development, productionPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Valhall in Valhall, 19.01.1998 to 19.04.1998 (90 days), to 5 611,0 m.
Water depth69,2 m
Total depth5 611,0 m MD
Vertical depth2 623,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud19.01.1998
Completed19.04.1998
OperatorAmoco Norway Oil Company
Position56,2781 N, 3,3956 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 77 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-A-19 same well | 0,0 | 4 931,3 | - | - | 1985 |
| 2/8-A-25 | 0,0 | 5 793,0 | - | - | 1990 |
| 2/8-A-25 A | 0,0 | 5 213,0 | - | - | 1995 |
| 2/8-A-25 B | 0,0 | 5 784,0 | - | - | 1995 |
| 2/8-A-18 | 0,0 | 4 294,0 | - | - | 1985 |
| 2/8-A-18 A | 0,0 | 4 456,0 | - | - | 1986 |
| 2/8-A-18 B | 0,0 | 3 691,0 | - | - | 1989 |
| 2/8-A-24 | 0,0 | 3 312,0 | - | - | 1988 |
Casing and formation tests
No casing programme is reported for this wellbore.