2/8-A-2
Development, productionPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Valhall in Valhall, 29.11.1981 to 11.07.1982 (224 days), to 3 480,0 m.
Water depth69,0 m
Total depth3 480,0 m MD
Vertical depth2 659,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud29.11.1981
Completed11.07.1982
OperatorAmoco Norway Oil Company
Position56,2780 N, 3,3956 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 78 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-A-2 A same well | 0,0 | 3 221,0 | - | - | 1995 |
| 2/8-A-28 | 0,0 | 5 918,0 | - | - | 1992 |
| 2/8-A-27 | 0,0 | 3 907,0 | - | - | 1990 |
| 2/8-A-23 | 0,0 | 5 472,0 | - | - | 1988 |
| 2/8-A-15 | 0,0 | 3 094,5 | - | - | 1985 |
| 2/8-A-15 A | 0,0 | 3 070,0 | - | - | 1987 |
| 2/8-A-26 | 0,0 | 5 330,0 | - | - | 1992 |
| 2/8-A-26 A | 0,0 | 4 389,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.