2/8-A-15
Development, productionPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Valhall in Valhall, 09.01.1985 to 28.01.1985 (19 days), to 3 094,5 m.
Water depth69,0 m
Total depth3 094,5 m MD
Vertical depth2 663,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud09.01.1985
Completed28.01.1985
OperatorAmoco Norway Oil Company
Position56,2780 N, 3,3955 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 78 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-A-15 A same well | 0,0 | 3 070,0 | - | - | 1987 |
| 2/8-A-28 | 0,0 | 5 918,0 | - | - | 1992 |
| 2/8-A-30 | 0,0 | 5 746,0 | - | - | 1993 |
| 2/8-A-30 A | 0,0 | 5 733,0 | - | - | 1994 |
| 2/8-A-30 B | 0,0 | 7 068,0 | - | - | 1994 |
| 2/8-A-2 | 0,0 | 3 480,0 | - | - | 1981 |
| 2/8-A-2 A | 0,0 | 3 221,0 | - | - | 1995 |
| 2/8-A-6 | 0,0 | 2 875,0 | - | - | 1983 |
Casing and formation tests
No casing programme is reported for this wellbore.