WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-A-6

2/8-A-6

Development, productionPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Valhall in Valhall, 19.07.1983 to 05.09.1983 (48 days), to 2 875,0 m.

Water depth69,0 m
Total depth2 875,0 m MD
Vertical depth2 648,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud19.07.1983
Completed05.09.1983
OperatorAmoco Norway Oil Company
Position56,2780 N, 3,3955 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient78 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-A-6 A same well0,02 720,0--1998
2/8-A-90,03 295,0--1983
2/8-A-9 A0,03 212,0--1997
2/8-A-70,02 856,0--1983
2/8-A-7 A0,02 925,0--1988
2/8-A-7 B0,04 577,0--1994
2/8-A-300,05 746,0--1993
2/8-A-30 A0,05 733,0--1994

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗