WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-A-30

2/8-A-30

Development, productionPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Valhall in Valhall, 29.01.1993 to 07.04.1993 (68 days), to 5 746,0 m.

Water depth69,0 m
Total depth5 746,0 m MD
Vertical depth2 569,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud29.01.1993
Completed07.04.1993
OperatorAmoco Norway Oil Company
Position56,2780 N, 3,3955 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient75 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-A-30 A same well0,05 733,0--1994
2/8-A-30 B same well0,07 068,0--1994
2/8-16 S0,03 139,0-1,761997
2/8-A-150,03 094,5--1985
2/8-A-15 A0,03 070,0--1987
2/8-A-200,04 334,0--1988
2/8-A-20 A0,03 795,0--1989
2/8-A-20 B0,04 758,0--1997

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗