WellplannerNorwegian shelf well data

Fields / Valhall / 2/8-A-20

2/8-A-20

Development, productionPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Valhall in Valhall, 17.06.1988 to 30.07.1988 (43 days), to 4 334,0 m.

Water depth69,0 m
Total depth4 334,0 m MD
Vertical depth2 907,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud17.06.1988
Completed30.07.1988
OperatorAmoco Norway Oil Company
Position56,2780 N, 3,3954 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Valhall gradient29,1 °C/km
Estimated at total depth from the gradient85 °C

The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/8-A-20 A same well0,03 795,0--1989
2/8-A-20 B same well0,04 758,0--1997
2/8-A-20 C same well0,04 490,0--1997
2/8-A-20 D same well0,03 322,0--1997
2/8-16 S0,03 139,0-1,761997
2/8-A-220,03 775,0--1989
2/8-A-22 A0,04 665,0--1999
2/8-A-300,05 746,0--1993

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗