2/8-A-20 C
Development, productionJunked
Drilled by Amoco Norway Oil Company with Valhall in Valhall, 10.05.1997 to 30.05.1997 (20 days), to 4 490,0 m.
Water depth69,0 m
Total depth4 490,0 m MD
Vertical depth2 625,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud10.05.1997
Completed30.05.1997
OperatorAmoco Norway Oil Company
Position56,2780 N, 3,3954 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 77 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-A-20 same well | 0,0 | 4 334,0 | - | - | 1988 |
| 2/8-A-20 A same well | 0,0 | 3 795,0 | - | - | 1989 |
| 2/8-A-20 B same well | 0,0 | 4 758,0 | - | - | 1997 |
| 2/8-A-20 D same well | 0,0 | 3 322,0 | - | - | 1997 |
| 2/8-16 S | 0,0 | 3 139,0 | - | 1,76 | 1997 |
| 2/8-A-22 | 0,0 | 3 775,0 | - | - | 1989 |
| 2/8-A-22 A | 0,0 | 4 665,0 | - | - | 1999 |
| 2/8-A-30 | 0,0 | 5 746,0 | - | - | 1993 |
Casing and formation tests
No casing programme is reported for this wellbore.