2/8-A-21
Development, productionJunked
Drilled by Amoco Norway Oil Company with Valhall in Valhall, 08.02.1986 to 12.03.1986 (32 days), to 4 672,0 m.
Water depth69,0 m
Total depth4 672,0 m MD
Vertical depth2 736,9 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud08.02.1986
Completed12.03.1986
OperatorAmoco Norway Oil Company
Position56,2781 N, 3,3955 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 80 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.