2/8-A-24 A
Development, productionPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Valhall in Valhall, 12.06.1993 to 03.07.1993 (21 days), to 2 924,0 m.
Water depth69,0 m
Total depth2 924,0 m MD
Vertical depth2 683,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table44,0 m
Formation at total depth-
RigValhall
Spud12.06.1993
Completed03.07.1993
OperatorAmoco Norway Oil Company
Position56,2781 N, 3,3956 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 79 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-A-24 same well | 0,0 | 3 312,0 | - | - | 1988 |
| 2/8-A-18 | 0,0 | 4 294,0 | - | - | 1985 |
| 2/8-A-18 A | 0,0 | 4 456,0 | - | - | 1986 |
| 2/8-A-18 B | 0,0 | 3 691,0 | - | - | 1989 |
| 2/8-A-1 | 0,0 | 2 675,0 | - | - | 1981 |
| 2/8-A-1 A | 0,0 | 2 528,0 | - | - | 1993 |
| 2/8-A-26 | 0,0 | 5 330,0 | - | - | 1992 |
| 2/8-A-26 A | 0,0 | 4 389,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.