2/8-F-7
Development, productionClosedOil
Drilled by Amoco Norway Oil Company with Mærsk Guardian in Valhall, 13.05.1997 to 30.06.1997 (48 days), to 5 066,0 m.
Water depth71,0 m
Total depth5 066,0 m MD
Vertical depth2 575,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,2 m
Formation at total depth-
RigMærsk Guardian
Spud13.05.1997
Completed30.06.1997
OperatorAmoco Norway Oil Company
Position56,2766 N, 3,3964 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 75 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-G-20 | 0,0 | 384,0 | - | - | 2011 |
| 2/8-G-20 A | 0,0 | 5 561,0 | - | - | 2017 |
| 2/8-F-14 | 0,0 | 2 635,1 | - | - | 1998 |
| 2/8-F-13 | 0,0 | 4 567,0 | - | - | 1998 |
| 2/8-F-13 A | 0,0 | 4 823,0 | - | - | 2001 |
| 2/8-G-24 | 0,0 | 4 134,0 | - | - | 2005 |
| 2/8-F-10 | 0,0 | 4 348,0 | - | - | 1999 |
| 2/8-F-4 | 0,0 | 4 918,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.