Development, observationPlugged
Drilled by BP Norge AS with Valhall Ip in Valhall, 10.06.2011 to 13.06.2011 (3 days), to 384,0 m.
Water depth73,7 m
Total depth384,0 m MD
Vertical depth381,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table65,3 m
Formation at total depth-
RigValhall Ip
Spud10.06.2011
Completed13.06.2011
OperatorBP Norge AS
Position56,2766 N, 3,3964 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 11 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-G-20 A same well | 0,0 | 5 561,0 | - | - | 2017 |
| 2/8-F-7 | 0,0 | 5 066,0 | - | - | 1997 |
| 2/8-F-16 | 0,0 | 5 252,0 | - | - | 1999 |
| 2/8-G-19 | 0,0 | 3 968,0 | - | - | 2009 |
| 2/8-G-16 | 0,0 | 4 401,0 | - | - | 2009 |
| 2/8-G-16 A | 0,0 | 4 781,0 | - | - | 2009 |
| 2/8-G-16 B | 0,0 | 5 137,0 | - | - | 2009 |
| 2/8-F-6 | 0,0 | 4 460,0 | - | - | 1996 |
Casing and formation tests