2/8-G-16
Development, observationPlugged
Drilled by BP Norge AS with Valhall Ip in Valhall, 31.01.2009 to 23.03.2009 (51 days), to 4 401,0 m.
Water depth73,7 m
Total depth4 401,0 m MD
Vertical depth2 677,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table65,3 m
Formation at total depth-
RigValhall Ip
Spud31.01.2009
Completed23.03.2009
OperatorBP Norge AS
Position56,2765 N, 3,3964 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 78 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-G-16 A same well | 0,0 | 4 781,0 | - | - | 2009 |
| 2/8-G-16 B same well | 0,0 | 5 137,0 | - | - | 2009 |
| 2/8-F-12 | 0,0 | 5 166,0 | - | - | 1998 |
| 2/8-F-16 | 0,0 | 5 252,0 | - | - | 1999 |
| 2/8-G-15 | 0,0 | 3 422,0 | - | - | 2006 |
| 2/8-G-20 | 0,0 | 384,0 | - | - | 2011 |
| 2/8-G-20 A | 0,0 | 5 561,0 | - | - | 2017 |
| 2/8-G-12 | 0,0 | 4 684,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.