2/8-V-10
Development, productionOnline
Drilled by Aker BP ASA with Noble Integrator in Valhall, from 18.07.2019.
Water depth69,6 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table70,2 m
Formation at total depth-
RigNoble Integrator
Spud18.07.2019
Completed-
OperatorAker BP ASA
Position56,2513 N, 3,3492 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/8-V-7 | 0,0 | 5 270,0 | - | - | 2020 |
| 2/8-V-11 | 0,0 | 6 598,0 | - | - | 2022 |
| 2/8-V-8 | 0,0 | 4 905,0 | - | - | 2019 |
| 2/8-V-4 | 0,0 | 5 346,0 | - | - | 2020 |
| 2/8-V-4 Y2 | 0,0 | 5 433,0 | - | - | 2020 |
| 2/8-V-12 | 0,0 | 5 152,0 | - | - | 2020 |
| 2/8-V-12 Y2 | 0,0 | 7 030,0 | - | - | 2020 |
| 2/8-V-5 | 0,0 | 5 284,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.