2/8-V-11
Development, productionProducingOil
Drilled by Aker BP ASA with Maersk Invincible in Valhall, 06.04.2022 to 25.04.2022 (19 days), to 6 598,0 m.
Water depth69,6 m
Total depth6 598,0 m MD
Vertical depth2 679,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table70,4 m
Formation at total depth-
RigMaersk Invincible
Spud06.04.2022
Completed25.04.2022
OperatorAker BP ASA
Position56,2513 N, 3,3492 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Valhall gradient | 29,1 °C/km |
| Estimated at total depth from the gradient | 78 °C |
The gradient is the median of 8 released wells in Valhall with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.