24/9-6
Exploration, appraisalPlugged and abandonedOil
Drilled by Fina Production Licenses AS with West Delta in Volund, 01.02.1994 to 07.03.1994 (34 days), to 2 255,0 m in the Heimdal Formation.
Water depth123,5 m
Total depth2 255,0 m MD
Vertical depth2 255,0 m TVD
Bottom-hole temperature60 °C
Max inclination3,7°
Rotary table29,0 m
Formation at total depthHeimdal Formation
RigWest Delta
Spud01.02.1994
Completed07.03.1994
OperatorFina Production Licenses AS
Position59,4838 N, 1,9575 E
Formations
21 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 60 °C |
| Volund gradient | 35,3 °C/km |
| Estimated at total depth from the gradient | 78 °C |
The gradient is the median of 5 released wells in Volund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/9-7 | 0,6 | 2 280,0 | 79 °C | 1,30 | 2004 |
| 24/9-7 A | 0,6 | 2 277,0 | 77 °C | 1,31 | 2004 |
| 24/9-7 B | 0,6 | 2 230,0 | 75 °C | 1,31 | 2004 |
| 24/9-7 C | 0,6 | 2 363,0 | 74 °C | 1,34 | 2004 |
| 24/9-P-9 H | 1,4 | 4 616,0 | - | - | 2016 |
| 24/9-P-7 AH | 1,4 | 4 658,0 | - | - | 2016 |
| 24/9-P-7 H | 1,4 | 3 248,0 | - | - | 2016 |
| 24/9-P-10 AH | 1,4 | 3 272,0 | - | - | 2016 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 249,0 | 36" | 254,0 | - |
| Surface casing | 13 3/8" | 1 279,0 | 17 1/2" | 1 286,0 | - |
| Intermediate | 9 5/8" | 1 957,0 | 12 1/4" | 1 963,0 | - |
| Open hole | - | 2 255,0 | 8 1/2" | 2 255,0 | - |
Mud weight
30 measurements, one dot each, 1,00 to 1,55 g/cm³ against measured depth, dummy, water based.