24/9-M-1 BH
Development, productionClosedOil
Drilled by Marathon Oil Norge AS with Transocean Winner in Bøyla, 16.05.2014 to 23.06.2014 (38 days), to 4 628,0 m.
Water depth120,0 m
Total depth4 628,0 m MD
Vertical depth2 149,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigTransocean Winner
Spud16.05.2014
Completed23.06.2014
OperatorMarathon Oil Norge AS
Position59,3414 N, 1,8288 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Bøyla report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/9-M-1 AH same well | 0,0 | 2 727,0 | - | - | 2014 |
| 24/9-M-1 H same well | 0,0 | 3 138,0 | - | - | 2014 |
| 24/9-M-2 H | 0,0 | 4 894,0 | - | - | 2014 |
| 24/9-M-3 AH | 0,0 | 2 957,0 | - | - | 2014 |
| 24/9-M-3 H | 0,0 | 2 995,0 | - | - | 2014 |
| 24/9-M-5 H | 0,1 | 4 975,0 | - | - | 2022 |
| 24/9-M-6 Y1H | 0,1 | 3 442,0 | - | - | 2022 |
| 24/9-M-6 Y2H | 0,1 | 4 092,0 | - | - | 2022 |
Casing and formation tests
No casing programme is reported for this wellbore.