WellplannerNorwegian shelf well data

Fields / Bøyla / 24/9-M-6 Y1H

24/9-M-6 Y1H

Development, productionProducingOil

Drilled by Aker BP ASA with Deepsea Nordkapp in Bøyla, 08.10.2022 to 01.12.2022 (54 days), to 3 442,0 m.

Water depth120,0 m
Total depth3 442,0 m MD
Vertical depth1 865,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,7 m
Formation at total depth-
RigDeepsea Nordkapp
Spud08.10.2022
Completed01.12.2022
OperatorAker BP ASA
Position59,3421 N, 1,8275 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

1 released well in Bøyla report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
24/9-M-6 Y2H same well0,04 092,0--2022
24/9-M-5 H0,04 975,0--2022
24/9-M-1 AH0,12 727,0--2014
24/9-M-1 BH0,14 628,0--2014
24/9-M-1 H0,13 138,0--2014
24/9-M-2 H0,14 894,0--2014
24/9-M-3 AH0,12 957,0--2014
24/9-M-3 H0,12 995,0--2014

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗