WellplannerNorwegian shelf well data

Fields / Bøyla / 24/9-M-4 Y1H

24/9-M-4 Y1H

Development, productionClosedOil

Drilled by Aker BP ASA with Scarabeo 8 in Bøyla, 14.03.2019 to 18.05.2019 (65 days), to 5 306,0 m.

Water depth119,0 m
Total depth5 306,0 m MD
Vertical depth1 860,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud14.03.2019
Completed18.05.2019
OperatorAker BP ASA
Position59,3414 N, 1,8320 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

1 released well in Bøyla report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
24/9-15 A0,03 853,0-1,422019
24/9-15 S0,04 310,0-1,422019
24/9-M-4 Y2H same well0,04 652,0--2019
24/9-M-4 Y3H same well0,04 884,0--2019
24/9-M-7 Y1H0,24 400,0--2025
24/9-M-7 Y2H0,24 400,0--2025
24/9-M-7 Y3H0,23 746,7--2025
24/9-M-2 H0,24 894,0--2014

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗