WellplannerNorwegian shelf well data

Fields / Bøyla / 24/9-M-7 Y1H

24/9-M-7 Y1H

Development, productionProducingOil

Drilled by Aker BP ASA with Deepsea Nordkapp in Bøyla, 17.05.2025 to 17.06.2025 (31 days), to 4 400,0 m.

Water depth119,0 m
Total depth4 400,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud17.05.2025
Completed17.06.2025
OperatorAker BP ASA
Position59,3422 N, 1,8344 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

1 released well in Bøyla report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
24/9-M-7 Y2H same well0,04 400,0--2025
24/9-M-7 Y3H same well0,03 746,7--2025
24/9-15 A0,23 853,0-1,422019
24/9-15 S0,24 310,0-1,422019
24/9-M-4 Y1H0,25 306,0--2019
24/9-M-4 Y2H0,24 652,0--2019
24/9-M-4 Y3H0,24 884,0--2019
24/9-M-2 H0,34 894,0--2014

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗