24/9-M-7 Y1H
Development, productionProducingOil
Drilled by Aker BP ASA with Deepsea Nordkapp in Bøyla, 17.05.2025 to 17.06.2025 (31 days), to 4 400,0 m.
Water depth119,0 m
Total depth4 400,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud17.05.2025
Completed17.06.2025
OperatorAker BP ASA
Position59,3422 N, 1,8344 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Bøyla report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/9-M-7 Y2H same well | 0,0 | 4 400,0 | - | - | 2025 |
| 24/9-M-7 Y3H same well | 0,0 | 3 746,7 | - | - | 2025 |
| 24/9-15 A | 0,2 | 3 853,0 | - | 1,42 | 2019 |
| 24/9-15 S | 0,2 | 4 310,0 | - | 1,42 | 2019 |
| 24/9-M-4 Y1H | 0,2 | 5 306,0 | - | - | 2019 |
| 24/9-M-4 Y2H | 0,2 | 4 652,0 | - | - | 2019 |
| 24/9-M-4 Y3H | 0,2 | 4 884,0 | - | - | 2019 |
| 24/9-M-2 H | 0,3 | 4 894,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.