24/9-P-5 AH
Development, productionPluggedOil and gas
Drilled by Marathon Petroleum Norge AS with DEEPSEA BERGEN decom in Volund, 04.05.2009 to 22.05.2009 (18 days), to 3 510,0 m.
Water depth124,0 m
Total depth3 510,0 m MD
Vertical depth1 963,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud04.05.2009
Completed22.05.2009
OperatorMarathon Petroleum Norge AS
Position59,4959 N, 1,9651 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Volund gradient | 35,3 °C/km |
| Estimated at total depth from the gradient | 68 °C |
The gradient is the median of 5 released wells in Volund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 24/9-P-5 BH same well | 0,0 | 3 442,0 | - | - | 2021 |
| 24/9-P-5 H same well | 0,0 | 2 370,0 | - | - | 2009 |
| 24/9-P-3 AH | 0,0 | 3 930,0 | - | - | 2009 |
| 24/9-P-3 BH | 0,0 | 3 975,0 | - | - | 2019 |
| 24/9-P-3 H | 0,0 | 2 610,0 | - | - | 2009 |
| 24/9-P-4 AH | 0,0 | 2 784,0 | - | - | 2009 |
| 24/9-P-4 H | 0,0 | 2 563,0 | - | - | 2009 |
| 24/9-P-2 AY1H | 0,0 | 4 137,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.