WellplannerNorwegian shelf well data

Fields / Volund / 24/9-P-5 H

24/9-P-5 H

Development, productionPluggedOil and gas

Drilled by Marathon Petroleum Norge AS with DEEPSEA BERGEN decom in Volund, 11.04.2009 to 30.04.2009 (19 days), to 2 370,0 m.

Water depth124,0 m
Total depth2 370,0 m MD
Vertical depth2 031,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigDEEPSEA BERGEN decom
Spud11.04.2009
Completed30.04.2009
OperatorMarathon Petroleum Norge AS
Position59,4959 N, 1,9651 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Volund gradient35,3 °C/km
Estimated at total depth from the gradient70 °C

The gradient is the median of 5 released wells in Volund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
24/9-P-5 AH same well0,03 510,0--2009
24/9-P-5 BH same well0,03 442,0--2021
24/9-P-3 AH0,03 930,0--2009
24/9-P-3 BH0,03 975,0--2019
24/9-P-3 H0,02 610,0--2009
24/9-P-4 AH0,02 784,0--2009
24/9-P-4 H0,02 563,0--2009
24/9-P-2 AY1H0,04 137,0--2010

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗