Fields / 25/1-10
25/1-10
Exploration, wildcatPlugged and abandonedDry
Drilled by Elf Petroleum Norge AS with Vinni, 19.04.1988 to 14.09.1988 (148 days), to 4 739,0 m in the Brent Group.
Water depth99,0 m
Total depth4 739,0 m MD
Vertical depth4 732,6 m TVD
Bottom-hole temperature149 °C
Max inclination-
Rotary table27,0 m
Formation at total depthBrent Group
RigVinni
Spud19.04.1988
Completed14.09.1988
OperatorElf Petroleum Norge AS
Position59,9524 N, 2,0967 E
Formations
13 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 149 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 25/1-2 | 2,0 | 2 772,0 | 72 °C | - | 1971 |
| 25/1-7 | 3,8 | 2 719,0 | 58 °C | 1,26 | 1985 |
| 25/1-7 R | 3,8 | 2 719,0 | - | - | 1987 |
| 25/1-7 R2 | 3,8 | 2 716,0 | - | - | 1988 |
| 25/1-7 R3 | 3,8 | 2 716,0 | - | - | 1989 |
| 25/1-7 R4 | 3,8 | 2 716,0 | - | - | 1990 |
| 25/1-8 S | 5,7 | 2 650,0 | 65 °C | 1,23 | 1985 |
| 25/1-8 SR | 5,7 | 2 650,0 | - | - | 1987 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 188,0 | 36" | 188,0 | - |
| Surface casing | 20" | 910,0 | 26" | 923,0 | 1,17 LOT |
| Intermediate | 13 3/8" | 2 825,0 | 17 1/2" | 2 839,0 | 1,72 LOT |
| Intermediate | 9 5/8" | 4 043,0 | 12 1/4" | 4 058,0 | 2,15 LOT |
| Liner | 7" | 4 451,0 | 8 1/2" | 4 471,0 | 2,25 LOT |
Mud weight
45 measurements, one dot each, 1,00 to 2,15 g/cm³ against measured depth, water based.